Cookie-Settings

Here you can see and modify the cookie settings of various tools used on www.advantageaustria.org and related subdomains.


Save settings
Advantage Austria Show navigation

Drive system for the world’s largest vertical lift bridge

Waagner-Biro Bridge Division, headquartered in Vienna, builds the drive system of the "Botlek lift bridge" near the area of the Rotterdam port. The Botlek vertical lift bridge is a project of superlatives – it has the heaviest weight, the greatest lift frequency and the highest lift speed of any vertical lift bridge.

Waagner Biro is globally leading in the construction of bridges, steel-glass-domes, stage technology and special purpose machinery. The company has completed more than 4,000 bridge projects worldwide and has been gathering expertise since almost 160 years now. Waagner-Biro was awarded the Botlek contract thanks to its extensive know-how and broad technical experience in building complex bridge systems.

The contractor is a joint venture comprising the construction companies Strabag, Strukton and BallastNedam. The companies were commissioned to construct a 36-kilometre motorway section near Rotterdam where a new double span lift bridge will replace the old Botlek lift bridge.

The bridge will carry four traffic lanes and two hard shoulders as well as a double-track railway line. It will be opened around once every hour, or 9,000 times per year. With two spans of 90 metres each and a width of 50 metres, the weight to be lifted is impressive 4,850 tonnes on each side. 
print
©©ADVANTAGE AUSTRIA