Cookie-Settings

Here you can see and modify the cookie settings of various tools used on www.advantageaustria.org and related subdomains.


Save settings
Advantage Austria Show navigation

Work in Progress: Varodd Bridge

Varoddbru © PNC Norge AS

© PNC Norge AS

14. November 2018

Austrian PNC to construct a new version of Norwegian landmark bridge 

Renowned Austrian entrepreneur PNC is currently building a new bridge for the Norwegian State Highways Authority designed by Rambøll/Johs Holt. The construction period is set to a total of three years (2017-2020). The new FFB bridge will be 654m long and 19m wide and is built in 3 steps.  

At the Bridge-Conference 2018 on 12th/13th of November at Radisson Blu Scandinavia Hotel in Oslo the PNC project was presented in a varied program of both domestic and foreign projects by the Norwegian Public Roads Administration (Statens vegvesen). Furthermore, new information on the latest projects in the region was provided. 

Please find more technical details of huge Varodd-Bridge below:

  • Concrete underlay, B55 Standard: 1400 m3
  • Concrete underlay, B45 Standard: 4300 m3
  • Concrete underlay, B35 AUV: 500 m3
  • Concrete in superstructure, B65 Standard: 15800 m3
  • Concrete in superstructure, B45 Low heat: 1000 m3
  • Reinforcement superstructure: 3700 tonnes
  • Reinforcement underlay: 1200 tonnes
  • Tensioning cables in the bridge deck: 238000 mMN


Varoddbrue © PNC Norge AS

© PNC Norge AS

print
©©ADVANTAGE AUSTRIA